Picture 29.11.2022 New environmental permit for the Meltola wastewater treatment plant In the new permit, the limit values will be tightened. Other conditions are also set for the operation of the wastewater treatment plant.
Picture 17.11.2022 Even during short power outages, you should minimize water use You should avoid taking a shower during a power outage.
Picture 20.1.2023 16:53 Waste water flowed into a field ditch near the construction site in Linnansuo The estimated amount of wastewater overflow is about 50 m3.
Picture 20.1.2023 15:56 Updated: Päivärinteenkatu sewage pumping station overflows into Lampsiinjoki The overflow was stopped on Monday evening, January 16.1. by midnight.
Picture 4.1.2023 14:45 Imatran Vesi will use Intrum's reminder and collection services as part of its receivables management The cooperation with Intrum concerns overdue receivables, such as debt capital, interest or costs related to reminders and collection.
Picture 30.12.2022 11:24 UPDATED 1.1.2023/XNUMX/XNUMX: Drinking water no longer needs to be boiled in the Mehiläimäki area The laboratory results completed today, January 1.1.2023, XNUMX, showed no more signs of water contamination. You can use water normally.
Picture 25.12.2022 13:53 UPDATED: A pipe break cut off the water in the Haraka area, the water supply will be restored in ten countries in the evening It was a big pipe break.
Picture 9.12.2022 11:45 Updated: Water main leak in the Meltola area The suspected leak on Tattarikuja turned out to be on Hernekallionkatu. The leak has now been fixed.