Enabling the choice of a low-emission heating method in the site plan (e.g. connection to the district heating network, geothermal heat, solar energy)
Resources and responsible party:
No additional resources required. Planning is responsible for the measure.
Implementation:
Annual follow-up
Effect of the procedure:
Switching to renewable energy from fossil fuels reduces greenhouse emissions.
Situation in December 2021:
A biogas filling station was opened in Vuoksenniska on April 22.4.2021, XNUMX.
Situation in May 2021:
No new charging points have been built.
Situation in May 2022:
The latest biogas filling station for Imatra was opened in Vuoksenniska on April 22.4.2021, XNUMX.